Screw Pile Projects

N4 Transmission Line, Manitoba Hydro
Keewatinohk Transmission Line, Manitoba Hydro
Center Port Canada Highway, Winnipeg, SNC Lavalin
(10 – 8 ⅝” Piles) & (12 – 12 ¾”Piles)

SaskPower Switching Stations;

– Auburnton (151 Piles)
– Brada (62 Piles)
– Edam (69 Piles)
– Golden Lake (81 Piles)
– Kisbey (120 Piles)
– Morse Creek (40 Piles)
– Pasqua (326 Piles)
– Peebles (65 Piles)
– Swift Current (251 Piles)
– Wolverine (115 Piles)

Queen Elizabeth Substation Upgrade, Saskatoon (15 Piles)
Cargill Fertilizer Facility, Clavet: 24 + 6(24”d x 55’ x (4) 48”hx) Piles
Blairmore Co-op, Saskatoon (45 Piles)
Co-op, North Battleford (115 Piles)
Co-op, Ave C. & Circle Drive, Saskatoon (84 Piles)
Windermere Condo Remediation Project, Prince Albert (227 Sectioned Piles in 8’ Headroom)
Viterra/ White Star Shipping and Storage Expansion, Prince Albert (210 – 60’ Long Piles)
Crane Pad, Boundary Dam, Estevan (28 – 16”d Piles)
Gimby Bridge, Gimby MB (8 Piles) *One of the first bridges on screw piles.
Warman Golden Health Centre (422 Piles)

Shoring

42nd Street Lift Station (41 – 30’ Long Soldier Piles)
Queen Street Shoring Wall, Saskatoon (21 – 26’ Long Solder Piles)
Beach Retaining Wall, Sask Land Provincial Park (70 – 20’ Long Helical Tie Backs)
Shangri-La Condo Shoring Wall, Saskatoon (58 – 30’ Long SoldierPiles)
(15 – 35’ Long Soldier Piles)
Saskatchewan Children’s Hospital Shoring Wall, Saskatoon (61 – Driven 30’ Long H-Piles)
Queen Elizabeth Power Station Shoring Wall, Saskatoon (8 piles in one/ 221 piles in another)

Driven Timber & Pipe Piles

Marriott Hotel in Stonebridge, Saskatoon (366 Timber Piles)

Northern Bridge Projects (Driven Steel Pipe);

– Pine River (26 Pipe Piles)
– McClurg Creek (26 Pipe Piles)
– Yaholnitsky Creek (26 Pipe Piles)

Rivers Edge Condo, Prince Albert (143 Timber Piles)
Commercial Retail Unit, Stonebridge, Saskatoon – Driven Timber & Steel Pipe (159 Timber & Steel Pipe Piles)
Transall Truck Wash, Saskatoon (70 Timber Piles)
Shoeless Joe’s Bar & Grille, Stonebridge, Saskatoon (37 Timber Piles)
SaskPower Maintenance Center, Prince Albert – (55 Pipe Piles) & Saskatoon (20 Steel Pipe Piles)
RCMP Detachment, Onion Lake (173 Timber Piles)
Regina Landfill Gas to Energy Upgrade (LFGTE) – (29 Pipe Piles)

Cast-In-Place Piles/Caissons

Gardiner Dam Terminal Joint Venture
P3 Joint Venture-Warman Traditions School, Warman – Bird/Wright (381 CIP Piles)
Langenburg School, Langenburg (216 CIP Piles)
Hyde Park View Condo, Saskatoon (378 CIP Piles)
HCL/CMI Building, Saskatoon (83 Belled Piles)

Co-op Buildings;

– Davidson (50 CIP Piles) – Saskatoon (Attridge) – (17 CIP Piles)
– Humboldt (74 CIP Piles) – Shaunavon (40 CIP Piles)
– Macklin (55 CIP Piles) – Warman (77 CIP Piles)
– Martensville(97 CIP Piles) – Westview, Saskatoon (70 CIP Piles)
– Prince Albert (78 CIP Piles) – Wynyard (58 CIP Piles)

U of S Childcare Expansion (116 CIP Piles)
U of S FAAR Building (19 Belled Piles)
Augustina Condo (80 CIP Piles) & Gabriella Condo (80 CIP Piles), Humboldt
Gymnastics Building, Regina (73 Belled Piles)
Kerrobert Health Care Center (296 CIP Piles)
New Roughrider Stadium, Regina (143 CIP Piles)
Brandt Tractor, Saskatoon (253 CIP Piles)

SaskPower Switching Stations;

– Aberdeen (283 CIP Piles)
– Halbright (5 CIP Piles)
– Lloydminster (90 CIP Piles)
– Martensville (376 CIP Piles)